Example: 7-storey aged care building
The client wanted to know if the five accommodation levels above a concrete podium could be built in timber, and who could supply it.
What we found
- The building suited timber: the floor layout repeats, spans are modest and the square plan makes stability simple.
- Five systems were considered. Loadbearing CLT and glulam post and beam were developed, with a timber-frame wall option on the CLT scheme.
- Australian and overseas suppliers were compared on landed cost, including freight, lead times and treatment options. Both were kept in play for pricing.
- Common areas were designed for 120-minute fire resistance by charring, so the timber can be left exposed.
- Risks flagged: CLT lift cores, CLT balconies, and wet areas over timber. Mitigations were recommended for each.